TrV Home Apogee Canyon Questra Industria Sitemap
Apogee Canyon Construction Photos | |
![]() |
December 2011: The base is built from 1" X 4" pine. Braces and risers are installed to support the plywood subroadbed. |
![]() |
The base plywood has been installed in the center of the curve and a piece of Styrofoam glued down. Cardboard strips are glued on to support the landscape. |
![]() |
![]() |
The upper track at the station is installed. Two retaining walls are installed. | |
![]() |
Jan 2012: Atlas Code 100 track is used at the station and Code 83 on the loop. Both are laid on foam roadbed. Paper towels have been glued to the scenery support and painted dark red. |
![]() |
A core car and the Colony 5 engine pull away from the station platform. |
![]() |
March 2013: The second layer of lightweight spackle is applied. Burgundy acrylic paint was added to the white spackle, creating a pink color. |
TrV Home Apogee Canyon Questra Industra Sitemap
copyright © 2013 Jack Hess
www.scifitrains.net